Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/staging-sdc/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the show-modified-date-in-admin-lists domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/staging-sdc/public_html/wp-includes/functions.php on line 6131
Science & Technology – SDC

SDC

Projects

Creating inspiring spaces through innovative design and construction

The Optic
20.01.2025

The Optic

The Optic’ provides 95,000 sq ft of flexible workspace and state-of-the-art laboratories, adjacent to the recently completed ARM HQ building.

Whittle Lab
20.01.2025

Whittle Lab

The New Whittle Laboratory, a £58 million facility, will be the leading global centre for net-zero aviation and energy.

NIAB Park Farm, Barns 1 & 2
20.12.2024

NIAB Park Farm, Barns 1 & 2

Barns 1 and 2 for NIAB are designed to provide a mixture of laboratories, offices, and controlled sporeproof growth rooms.

The Welding Institute
08.11.2024

The Welding Institute

A comprehensive redevelopment of The Welding Institute’s site to create a series of new structures connected to the main Bevan Braithwaite building via a link street.

Babraham R&D 2
06.11.2024

Babraham R&D 2

The Babraham Research Campus aims to be one of the leading centres for bioscience excellence.

Barton House
06.11.2024

Barton House

The construction of Barton House provides Abingdon Science Park with a new laboratory and office building.

1000 Discovery Drive
20.01.2025

1000 Discovery Drive

A versatile five-storey multi-occupancy structure, offering approximately 105,000 square feet of office and B1(b) laboratory space within the Cambridge Biomedical Campus.

Civil Engineering Building
06.11.2024

Civil Engineering Building

This project involved the construction of a three storey building for the Civil Engineering department at the west Cambridge campus.

NIAB East Malling Research (EMR)
06.11.2024

NIAB East Malling Research (EMR)

This project for NIAB EMR involved a site-wide redevelopment at their East Malling Site to enhance the company’s current operations and improve the working conditions for the employees at the site.

Project Zeta
29.10.2024

Project Zeta

One of the UK’s leading science and innovation campuses, and home to over 200 global organisations.

Project Birchwood
28.10.2024

Project Birchwood

Located next to the Melbourn Science Park, this large-scale development provides technology consultants TTP with three new state-of-the-art buildings.

One Granta
29.10.2024

One Granta

One Granta represents a pioneering venture, boasting a cutting-edge speculative laboratory and office edifice.